![]() ![]() The South Australian Government commenced market sounding process for the Torrens to Darlington section. The 2020-21 SA Budget allocated $30.5 million over FY2020-21 to finalise the business case for Torrens to Darlington section. The Federal and South Australian Governments jointly committed $5.4 billion for the Torrens to Darlington section of the North-South Corridor.Īfter reviewing the initial business case, and on advice from Infrastructure SA, the SA Government announced it will establish a Program Management Office within the Department of Planning, Transport and Infrastructure in early 2020. The project will be delivered using an Alliance contract. The South Australian Department for Infrastructure and Transport commenced a Registration of Interest process for Stage One and Stage Two of the Torrens to Darlington project, closing 7th March. ![]() The updated designs include two tunnels and has a revised total estimated cost of $15.4 billion. The SA Government released updated designs for the North South Corridor – River Torrens to Darlington project. The SA Government announced that the Torrens to Darlington tunnels would be delivered sequentially, and provided a revised project cost. The SA Government issued a Request for Tender (RFT) for a Probity Auditor, closing 17 May. The SA Government issued a Request for Tender for the Cost Estimating Services during the pre-procurement, procurement, and detailed design phases of the project, closing on 21 April. Responses to RFTs close on 17 February 2022. The SA Government opened Request for Tender (RFT) for the North-South Corridor Torrens to Darlington Operation, Maintenance and Systems Adviser role. The River Torrens to ANZAC Highway section will include over two kilometres of twin three-lane tunnels. The Designs confirm the two sections will include a combined 10.5 kilometres of motorway, comprising seven kilometres of tunnels. The SA Government released the Reference Design for the ANZAC Highway to Darlington and River Torrens to ANZAC Highway sections. The 2021-22 SA Budget allocated $3.3 billion over four years, including $151 million in FY2021-22.Ī project map revealing the southern entry and exit points of the tunnel was released. The scope was increased to include an additional lane and wider tunnels, raising the estimated total cost from $8.9 billion to $9.9 billion. The 2021-22 South Australia Budget revealed a change in scope and increase in cost for the Torrens to Darlington Section of the project. The T2D section would comprise 10.5 kilometres of motorway, including approximately seven kilometres of twin three-lane tunnels. Stage Two: River Torrens to ANZAC Highway.Stage One: ANZAC Highway to Darlington, and.Estimated at $15.4 billion, this section is to be delivered in two stages: The Torrens to Darlington (T2D) section is yet to be procured. Regency Road to Pym Street ($354 million).Torrens Road to River Torrens ($896 million).Sections that have already been contracted and were funded through a deal between the SA and Federal Governments include: Only downside, depending how you see it, would be there isn't much of a range of restaurants or cafes etc in immediate vicinity if that's what you are looking for, but being so central a short drive can get you to any place you want.The North-South Corridor will provide a dedicated non-stop thoroughfare for north and south bound traffic (including freight) running between Gawler and Old Noarlunga and passing through the Adelaide CBD, a distance of 78 kilometres (with 44 kilometres of motorway already complete). never had any issues with street crime etc and council have finally done much more tree planting in recent years so the streetscape will only improve with time. generally safe middle class neighbourhood, with a broad range of housing styles from units on the main roads to more older style homes in the back streets. other specialty shops in the centre like hairdresser/newsagent/fast food/24 hour service station on South Road which is like small supermarket. Coles/kmart 5 minute walk, open most hours. City is a 5 minute drive, central to everything. peaceful quiet streets once away from the major roads (underpass substantially reduces noise with well contructed sound proofing). Best for public transport, very regular services along Anzac Highway from early till late, takes you to city, Glenelg, Flinders uni/hopspital. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |